//Virtual Pipeline System
Virtual Pipeline System2019-11-26T14:45:08+00:00
Virtual Pipeline System

The Virtual Pipeline System allows LNG to be transported to non-pipeline connected areas, especially the gas starved parts of Nigeria.  Greenville LNG has brought the first LNG fueled trucks into Nigeria to distribute LNG to our customers in all parts of the country.

Using LNG as fuel enables an economic alternative for long haul trucking, this will make a positive impact of about 35% reduction on transportation & logistics costs in Nigeria.

Our initial fleet of 300 cryogenic trucks have a capacity of 23 metric tonnes each and are able to travel a distance of more than 1000km on a stretch without refueling.  Greenville LNG trucks are fitted with GPS tracking devices to monitor movement and to ensure that LNG is delivered on time, every time.

Greenville LNG customers will be fitted with cryogenic storage tanks, full re-gasification units and other skids on-site, this will enable LNG to be stored at the customer’s end before refueling.

Greenville LNG customers have the added advantage of a virtual pipeline system that enables LNG to be distributed to industries all across the country, without any disruption in supplies.

To complement our Virtual Pipeline System, LNG refueling stations are strategically located across Nigeria:

  • Phase 1: Rumuji (Rivers State), Koton Karfe (Kogi State), Shagamu (Ogun State), Ikpoba LGA (EDO State) & Kakau LGA (Kaduna State)
  • Phase 2: Lagos, Abuja, Kano, Jos, Bauchi, Maiduguri, Sokoto, and more.